2018 Street Improvement Project
This project consists of the rehabilitation of various streets by means of various pavement rehabilitation methods.
Link to page -
2019 Asphalt Rejuvenation Program
Rejuvenating agents known as “CRF” and “Reclamite” are applied to the surface of previously resurfaced or reconstructed asphalt pavements. CRF is a mixture of liquid rejuvenating agents and fine aggregate that is applied to older and/or more porous pavement surfaces. Reclamite is a liquid that is applied to the newer and/or less porous pavement surfaces.
Link to page -
2019 Crack Sealing Program
The program consists of the filling and resealing of damaged asphalt pavements throughout the Village in order to extend the projected life of the roadway. The program is combined with other local towns as part of a singular contract, and is being bid by the Village of Woodridge.
Link to page -
2019 Street Improvement Project
This project consists of the rehabilitation of various streets and alleys by means of selected pavement rehabilitation methods.
Link to page -
Lufkin Pool Demolition
This project consists of the demolition and removal of the Lufkin Pool Complex.
Link to page -
Roosevelt Road - Summit to IL 83
This project consists of the widening and resurfacing of Roosevelt Road from Summit Avenue to IL Route 83 and a traffic signal installation.
Link to page -
South Monterey Stormwater Quality Project
The installation of multiple bio-retention systems within the existing drainage ditch area on South Monterey Avenue between Washington Boulevard and Madison Street.
Link to page -
Princeton Avenue Improvement Project
The Project consists of the removal of approximately 800 feet of combined sewer and its replacement with separated storm and sanitary sewers, the replacement of approximately 110 feet of water main, and the complete reconstruction of the road pavement.
Link to page -
Ridge Road Water Main Improvement Project
This project consists of the rehabilitation of Ridge Road from Yale to Ardmore. The project also includes replacement of the existing water main. The water main improvements are budgeted as part of IEPA Water Loan Group #3. Some selective sanitary sewer system improvements are included.
Link to page