2018 ADA Sidewalk Improvement Project
This project consists of the reconstruction of related sidewalk ramps at intersections on Lincoln Avenue, Ridge Road, and Hugo Court. The project will account for any structures already in place.
Link to page -
2018 Asphalt Rejuvenation Program
Rejuvenating agents known as “CRF” and “Reclamite” are applied to the surface of previously resurfaced or reconstructed asphalt pavements. CRF is a mixture of liquid rejuvenating agents and fine aggregate that is applied to older and/or more porous pavement surfaces. Reclamite is a liquid that is applied to the newer and/or less porous pavement surfaces.
Link to page -
2018 Pavement Markings Program
This project consists of the application of thermoplastic and modified urethane striping to asphalt and concrete pavement throughout the village.
Link to page -
2018 Pavement Patching Program
This project consists of selective resurfacing of roadway areas that have deteriorated over time and use.
Link to page -
North Ardmore Avenue Retaining Wall Project
This project consists of removal and installation of 52.5 feet of retaining wall along the northeast side of Ardmore Avenue Frontage road. The scope of work for the project includes removing and replacing existing curb and gutter, 2 foot wide resurfacing of the adjacent pavement, removal of trees in conflict, and clearing and restoring the parkway behind the retaining wall.
Link to page -
Roosevelt Road at Ardmore Avenue Widening
This project consists of the widening of Roosevelt Road and Ardmore Avenue (Right Turn Lanes).
Link to page -
2018 Traffic Signal Maintenance
This contract is for the maintenance of traffic signals located at the intersections of St. Charles Road and Westmore Avenue, St. Charles and Addison Avenue, St. Charles and Ardmore Avenue and St. Charles and Villa Avenue.