The storm drains in the street outside your home flow directly to waterways, without any treatment. It is therefore very important that no one be allowed to dump waste of any kind onto the street surface, drainage pipes, and ditches, or into storm drains – they are only for rainwater. If you see someone dumping anything onto street surfaces, into storm drains, or into any other device built to contain rainfall or runoff, please report it immediately by calling the Public Works Department at (630) 834-8505 or by completing this Village of Villa Park Stormwater Complaint (PDF) form.

For more information on the Stormwater Management Program please download the files below:

Project Updates

Posted Date
Description
September 2, 2016Staff is preparing a memorandum with recommendations to establish storm water and combined sewer separation fees.
August 12, 2016Staff is reviewing a draft ordinance establishing storm water and combined sewer separation fees.
July 29, 2016A copy of the recent PowerPoint presentation by Stanley consultants was included in the packet of information for the 07/25/2016 presentation. They will be performing additional rate analysis that will include the impact of an annual $1.5 million annual cash flow from a sales tax.
July 22, 2016A copy of the recent PowerPoint presentation by Stanley consultants will be included in the packet of information for the 07/25/2016 presentation at the Village Board meeting.
May 27, 2016Stanley consultants made a presentation of proposed water, waste water, combined sewer separation, and storm water rates at a Village Board meeting. A future workshop meeting is being considered.
March 25, 2016It is proposed to present the rate study update to the Village Board in April. There was some discussion of funding during the budget workshop of 03/21/2016.
March 18, 2016Village Manager, Finance Director, consultant and the Director of Public Works met to review the rate study spreadsheets. It is proposed to present the study to the Village Board in April.
March 4, 2016An updated schedule of capital improvements has been included in proposed Capital Improvement Program (CIP) for the rate study. Footnotes have been added to unfunded projects in the CIP.
February 26, 2016
  • Village staff submitted an updated schedule of capital improvements that coincide with the proposed Capital Improvement Program (CIP) for the rate study.
  • Village staff is updating the schedule of capital improvements to coincide with the proposed Capital Improvement Program (CIP)
  • The consultant is proposing a separate monthly fixed fee for future storm water project. It is proposed to present the rate study to the Village Board in March 2016.
  • The Village Manager and Director had a conference call with the rate study consultant. We discussed the recent drop in billed water consumption relative to pumpage, updated budget projections, and the estimated combined sewer separation and flood control costs. The will review the proposed water and waste budget to see what revisions to the spreadsheets may be needed.
  • Staff has completed its review of waste water and storm water expenses and submitted comments to the rate study consultant. Staff met to discuss revenue projections and a possible water audit.
  • It is not expected that all projects identified in the flood control studies can be implemented in the next ten years.
  • Village staff and the consultant held a kick-off conference call this week. The Village has been provided with a list of data that needs to be gathered and compiled.
  • Staff will be preparing to bid the Park and Michigan projects. The water and sewer rate study will include a possible capital component to the waste water fund to finance combined sewer separation. Village staff will be working on engineering agreements for combined sewer separation feasibility and design.
  • Staff will be seeking direction regarding funding for combined sewer separation costs for two upcoming road projects (Park-Villa to east end and Michigan– Park to Madison) at the July 20, 2015 Village Board meeting.