- Home
- Government
- Departments
- Public Works Department
- Engineering Division
- Construction Projects
Construction Projects
OVERVIEW
This page contains a listing of construction projects that are under active design or construction within the Village of Villa Park, as well as information related to bidding and resident participation. Archived completed projects can be found under the completed projects page. Proposed projects that have only completed preliminary design or are in the concept stages can be found in the annual CIP.
CAPITAL IMPROVEMENT PROJECTS
The Village's most current Capital Improvement Plan (CIP) can be found here.
Projects List
-
Completed Projects
Completed projects from 2014 to present.
Link to page -
2023 Rebuild Illinois Resurfacing Project
This project consists of primarily of milling and resurfacing various streets through ought the village, as well as intermittent curb and gutter removal and replacement, sidewalk curb ramp upgrades to current ADA standards, pavement patching, drainage and utility structure adjustments or reconstructions, landscaping restoration, and pavement markings.
Link to page -
Biermann Avenue (Sunset to North Avenue)
This project consists of the rehabilitation of North Biermann Avenue from Sunset Drive to North Avenue. The project also consists of the replacement of the existing water main, including fire hydrants, valves and water services. The project also includes some selective sanitary system improvements.
Link to page -
Bike Rack Upgrades
Link to page -
College Streets Improvement Project
This project consists of the replacement of existing 4" and 6" water mains on North Iowa Avenue from Stone to Vermont, on North Michigan Avenue from Stone to Vermont, and on West Vermont Street from Wisconsin to Harvard. The project will also include pavement improvements on Iowa and on a portion of Michigan Avenue.
Link to page -
Combined Sewer Separation
Link to page -
Harvard Avenue (Plymouth to Ridge)
This project consists of improvements on North Harvard Avenue from Plymouth Street to Ridge Road. The project includes the replacement of the existing 4" water main from Plymouth Street to Sunset Drive. The project also includes pavement removal, aggregate base course, Hot-Mix Asphalt Binder Course, Hot-Mix Asphalt Surface Course, curb and gutter installation, sidewalk removal and replacement, driveway pavement removal and replacement, adjusting sanitary services, storm sewer removal and replacement and parkway restoration.
Link to page -
Iowa and Vermont Improvement Project
This project consists of water main replacement and street improvements on North Michigan Avenue and West Vermont Street.
Link to page -
Michigan and Vermont Improvement Project
This project consists of water main replacement and street improvements on North Michigan Avenue and West Vermont Street.
Link to page -
Myrtle Avenue (Terry to Madison)
This project consists of improvements on South Myrtle Avenue from Terry Lane to Madison Street. The project includes the replacement of the existing 6" water main. The water main improvements are expected to be funded through an IEPA Water Loan.
Link to page -
Railroad Grade Separation
Link to page -
Sugar Creek Watershed Drainage Improvement Project
This project is a combination of the South Michigan Avenue Improvement (Madison to Jackson), Jackson Pond Overflow, Jackson Pond Outlet Project, and other upcoming projects.
Link to page -
Tri-Trail Connector Project
Link to page -
Villa Avenue Bridge Improvement Project
This project consists of the rehabilitation of the South Villa Avenue bridge over Sugar Creek.
Link to page -
Villa Avenue (St. Charles to North Ave)
This project consists of the rehabilitation of North Villa Avenue from S. Charles Road to North Avenue.
Link to page -
Washington Area Combined Sewer Separation Project
The Washington Area Combined Sewer Separation Project is a large scale multi-year plan to reduce local flooding frequency and severity, and sewer backups. This project consists of the separation of combined sewers on Washington Street from Yale to Monterey, Euclid Avenue from Madison to Highland, and Yale Avenue from Madison to Park. These areas were identified by the 2015 Comprehensive Flood Plan and Storm Sewer System Analysis prepared by Christopher B. Burke Engineering, Ltd. The Washington Area project has been broken up into multiple construction projects that will be bid and constructed separately over the course of several years.
Link to page -
Westmore and Wisconsin Improvement Project
This project consists of improvements on North Westmore Avenue from St. Charles Road to Division Street and South Wisconsin Avenue from Washington Street to Kenilworth Avenue. The project includes combined sewer separation. Some selective water and sanitary system improvements are also included. A new 10-inch water main is planned for the Westmore portion of the project.
Link to page -
Wisconsin Avenue (Vermont to Stone)
This project consists of the rehabilitation of North Wisconsin Avenue from Vermont Street to Stone Road by means of selected pavement rehabilitation methods. Some selective water and sanitary system improvements are also included.
Link to page -
Yale Avenue (Jackson to Madison)
This project consists of the rehabilitation of South Yale Avenue from Madison Street to Jackson Street. The project includes the installation of storm sewers. Some selective water system and sanitary sewer system improvements are also included.
Link to page -
Construction Projects Map
View a map of ongoing and planned construction projects in the Village of Villa Park.
Link to page -
Stormwater Management Program
Stormwater Management Program
Link to page