Washington Area Combined Sewer Separation - Section Three

General Information

Project Location(s):
South Yale Avenue between Madison Street and Park Boulevard
Washington Street between Yale Avenue and Illinois Avenue
Project Status:
Planning
Bid Opening Date:
TBD
Mandatory Pre Bid Meeting:
TBD
QuestCDN Number:
TBD
Construction Start Date:
TBD
Construction Completion Date:
TBD
Contractor:
TBD
Construction Engineer:
TBD
Design Engineer:
Christopher B. Burke Engineering, Ltd.
Awarded Contract Amount:
TBD
Adjusted Final Contract Amount:
TBD
Funding Source(s):
Street Improvement Fund, Street Referendum, Water Supply Fund, Wastewater Fund, Sewer Separation

Objective

To improve the condition of the roadway by means of selected pavement rehabilitation methods. To reduce the frequency and severity of flooding and sewer backups by separating the existing combined sewer.

Description

This project consists of the rehabilitation of South Yale Avenue from Madison Street to Park Boulevard and Washington Street from Yale Avenue to Illinois Avenue. This project includes combined sewer separation. Some selective water and sanitary system improvements are also included. The combined sewer separation proposed as part of this project cannot be completed until other portions of the Washington Area Combined Sewer Separation Project have been completed.

Justification

The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. his project is to be partially funded by voter approved bond proceeds. The Combined Sewer Separation Study has identified portions of this area as a high priority for sewer separation.

Bidding & Planholders  Information

Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.

Bidding Documents

Contract Documents

Project Updates

Date
Description
January 1, 2021This project is in the planning stages.