Project Location(s): | South Yale Avenue between Madison Street and Park Boulevard Washington Street between Yale Avenue and Illinois Avenue |
---|---|
Project Status: | Planning |
Bid Opening Date: | TBD |
Mandatory Pre Bid Meeting: | TBD |
QuestCDN Number: | TBD |
Construction Start Date: | TBD |
Construction Completion Date: | TBD |
Contractor: | TBD |
Construction Engineer: | TBD |
Design Engineer: | Christopher B. Burke Engineering, Ltd. |
Awarded Contract Amount: | TBD |
Adjusted Final Contract Amount: | TBD |
Funding Source(s): | Street Improvement Fund, Street Referendum, Water Supply Fund, Wastewater Fund, Sewer Separation |
To improve the condition of the roadway by means of selected pavement rehabilitation methods. To reduce the frequency and severity of flooding and sewer backups by separating the existing combined sewer.
This project consists of the rehabilitation of South Yale Avenue from Madison Street to Park Boulevard and Washington Street from Yale Avenue to Illinois Avenue. This project includes combined sewer separation. Some selective water and sanitary system improvements are also included. The combined sewer separation proposed as part of this project cannot be completed until other portions of the Washington Area Combined Sewer Separation Project have been completed.
The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. his project is to be partially funded by voter approved bond proceeds. The Combined Sewer Separation Study has identified portions of this area as a high priority for sewer separation.
Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.
Date | Description |
---|---|
January 1, 2021 | This project is in the planning stages. |