- Washington Sewer Separation - Section Two
Create a Website Account - Manage notification subscriptions, save form progress and more.
Project Location(s): | South Euclid Avenue from Madison Street to Highland Avenue East Washington Street from Illinois Avenue to Monterey Avenue |
---|---|
Project Status: | Design |
Bid Opening Date: | TBD |
Mandatory Pre Bid Meeting: | TBD |
QuestCDN Number: | TBD |
Construction Start Date: | 2023-2024 |
Construction Completion Date: | TBD |
Contractor: | TBD |
Construction Engineer: | TBD |
Design Engineer: | Christopher B. Burke Engineering, Ltd. |
Awarded Contract Amount: | TBD |
Adjusted Final Contract Amount: | TBD |
Funding Source(s): | Street Improvement Fund, Street Referendum, Stormwater Fund, Water Supply Fund, Wastewater Fund, Sewer Separation |
To improve the condition of the roadway by removing the existing pavement and replacing it with a new, structurally sound pavement. To reduce the frequency and severity of flooding and sewer backups by separating the existing combined sewer.
This project consists of pavement improvements and combined sewer separation on South Euclid Avenue from Madison Street to Highland Avenue and on Washington Street from Illinois Avenue to Monterey Avenue. Some selective water and sanitary system improvements are also included. Future sewer separation is proposed as a part of the Washington Area Combined Sewer Separation Project.
The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. The pavement improvements are to be partially funded by voter approved bond proceeds. The sewer separation was recommended by the 2015 Comprehensive Flood Plan and Storm Sewer Analysis prepared by Christopher B. Burke Engineering, Ltd.
Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.
Date | Description |
---|---|
October 17, 2022 | Project design is underway. Village consultants will be on-site periodically to take soil samples and perform surveying. |
January 1, 2021 | This project is in the planning stages. |