Westmore and Wisconsin Improvement Project

General Information

Project Location(s):
North Westmore Avenue from St. Charles to Division
South Wisconsin Avenue from Washington to Kenilworth
Project Status:
Planning
Bid Opening Date:
TBD
Mandatory Pre Bid Meeting:
TBD
QuestCDN Number:
TBD
Construction Start Date:
TBD
Construction Completion Date:
TBD
Contractor:
TBD
Construction Engineer:
TBD
Design Engineer:
Civiltech Engineering, Inc.
Awarded Contract Amount:
TBD
Adjusted Final Contract Amount:
TBD
Funding Source(s):
Street Referendum, Wastewater Fund, Sewer Separation, Water Supply Fund, IEPA Water Loan

Objective

To improve the condition of the roadway by means of selected pavement rehabilitation methods. To reduce the severity and frequency of flooding and sewer backups by separating the existing combined sewer.

Description

This project consists of improvements on North Westmore Avenue from St. Charles Road to Division Street and South Wisconsin Avenue from Washington Street to Kenilworth Avenue. The project includes combined sewer separation. Some selective water and sanitary system improvements are also included. A new 10-inch water main is planned for the Westmore portion of the project. The future water main is expected to be funded by the Illinois EPA Public Water Supply Loan Program.

Justification

The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. This project is to be partially funded by voter approved bond proceeds. It has been determined by the Combined Sewer Separation Study that these streets are a high priority for sewer separation.

Bidding & Planholders  Information

Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.

Bidding Documents

Contract Documents

Related Documents

Project Updates

Date
Description
October 7, 2022Initial fieldwork for the design of the project is underway.
September 16, 2022A design engineering agreement with Civiltech Engineering, inc. was approved at the September 12, 2022 village board meeting.
January 1, 2021This project is in the planning stages.