- Westmore and Wisconsin Improvement Project
Create a Website Account - Manage notification subscriptions, save form progress and more.
Project Location(s): | North Westmore Avenue from St. Charles to Division South Wisconsin Avenue from Washington to Kenilworth |
---|---|
Project Status: | Planning |
Bid Opening Date: | TBD |
Mandatory Pre Bid Meeting: | TBD |
QuestCDN Number: | TBD |
Construction Start Date: | TBD |
Construction Completion Date: | TBD |
Contractor: | TBD |
Construction Engineer: | TBD |
Design Engineer: | Civiltech Engineering, Inc. |
Awarded Contract Amount: | TBD |
Adjusted Final Contract Amount: | TBD |
Funding Source(s): | Street Referendum, Wastewater Fund, Sewer Separation, Water Supply Fund, IEPA Water Loan |
To improve the condition of the roadway by means of selected pavement rehabilitation methods. To reduce the severity and frequency of flooding and sewer backups by separating the existing combined sewer.
This project consists of improvements on North Westmore Avenue from St. Charles Road to Division Street and South Wisconsin Avenue from Washington Street to Kenilworth Avenue. The project includes combined sewer separation. Some selective water and sanitary system improvements are also included. A new 10-inch water main is planned for the Westmore portion of the project. The future water main is expected to be funded by the Illinois EPA Public Water Supply Loan Program.
The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. This project is to be partially funded by voter approved bond proceeds. It has been determined by the Combined Sewer Separation Study that these streets are a high priority for sewer separation.
Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.
Date | Description |
---|---|
October 7, 2022 | Initial fieldwork for the design of the project is underway. |
September 16, 2022 | A design engineering agreement with Civiltech Engineering, inc. was approved at the September 12, 2022 village board meeting. |
January 1, 2021 | This project is in the planning stages. |