- Myrtle Avenue (Terry to Madison)
Create a Website Account - Manage notification subscriptions, save form progress and more.
Project Location(s): | South Myrtle Avenue from Terry Lane to Madison Street |
---|---|
Project Status: | Planning |
Bid Opening Date: | TBD |
Mandatory Pre Bid Meeting: | TBD |
QuestCDN Number: | TBD |
Construction Start Date: | TBD |
Construction Completion Date: | TBD |
Contractor: | TBD |
Construction Engineer: | TBD |
Design Engineer: | TBD |
Awarded Contract Amount: | TBD |
Adjusted Final Contract Amount: | TBD |
Funding Source(s): | Street Referendum, Water Supply Fund, IEPA Water Loan |
To improve the condition of the roadway by means of selected pavement rehabilitation methods. To improve the water system capacity and reliability by replacing the existing water main.
This project consists of improvements on South Myrtle Avenue from Terry Lane to Madison Street. The project includes the replacement of the existing 6" water main. The water main improvements are expected to be funded through an IEPA Water Loan.
The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. The pavement improvements are to be partially funded by voter approved bond proceeds. The existing water main has a high incidence of water main breaks. The Illinois EPA Public Water Supply Loan Program (PWSLP) is expected to provide loan funding for the water main improvements.
Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.
Date | Description |
---|---|
January 1, 2021 | This project is in the planning stages. |