Myrtle Avenue Improvement Project (Terry to Madison)

General Information

Project Location(s):
South Myrtle Avenue from Terry Lane to Madison Street
Project Status:
Planning
Bid Opening Date:
TBD
Mandatory Pre Bid Meeting:
TBD
QuestCDN Number:
TBD
Construction Start Date:
TBD
Construction Completion Date:
TBD
Contractor:
TBD
Construction Engineer:
TBD
Design Engineer:
TBD
Awarded Contract Amount:
TBD
Adjusted Final Contract Amount:
TBD
Funding Source(s):
Street Referendum, Water Supply Fund, IEPA Water Loan

Objective

To improve the condition of the roadway by means of selected pavement rehabilitation methods. To improve the water system capacity and reliability by replacing the existing water main.

Description

This project consists of improvements on South Myrtle Avenue from Terry Lane to Madison Street. The project includes the replacement of the existing 6" water main. The water main improvements are expected to be funded through an IEPA Water Loan.

Justification

The Village’s Pavement Management Program has determined that the condition of the street has deteriorated to the point that pavement rehabilitation is needed. The pavement improvements are to be partially funded by voter approved bond proceeds. The existing water main has a high incidence of water main breaks. The Illinois EPA Public Water Supply Loan Program (PWSLP) is expected to provide loan funding for the water main improvements.

Bidding & Planholders  Information

Bidding will be conducted online through the bidding service QuestCDN. More information will be posted when it becomes available.

Bidding Documents

Contract Documents

Related Documents

Project Updates

Date
Description
January 1, 2021This project is in the planning stages.