2019 Pavement Patching Program
This project consists of selective resurfacing of roadway areas that have deteriorated over time and use.
Link to page -
2020 Home Avenue Water Tower Painting
Link to page -
2020 Street Improvement Project
This project consists of the rehabilitation of various streets and alleys by means of selected pavement rehabilitation methods.
Link to page -
Astor, Myrtle, and Euclid Improvement Project
This project consists of the reconstruction of Astor Court from Summit Avenue to Myrtle Avenue and Myrtle Avenue from Park to Highland, and includes storm sewer construction. Some selective water system and sanitary sewer system improvements are also included.
Link to page -
Cornell Pumping Station Generator Replacement
This project consists of the removal of the old diesel powered emergency generator at the South Cornell Pumping Station and its replacement with a new, natural gas powered emergency generator.
Link to page -
Michigan Avenue (Kenilworth to Central)
This project consists of pavement improvements on South Michigan Avenue from Central Boulevard to Kenilworth Avenue and the separation of the existing combined sewer main.
Link to page -
Plymouth Street Improvement Project
This project consists of improving Plymouth Street from Ardmore Avenue to Villa Avenue in the Village of Villa Park which includes hot-mix asphalt (HMA) resurfacing and HMA pavement reconstruction. The total length of improvements is 2,594 feet (0.49 mile). The pavement resurfacing areas will consist of 2” of HMA surface course and ¾” of polymerized leveling binder. These resurfacing areas will also have pavement patching and spot curb and gutter replacement based on field conditions. In addition, there will be sidewalk replacement at intersections to meet the Public Right-of-Way Accessibility Guidelines (PROWAG), driveway reconstruction, drainage and utility improvements, pavement markings, signing, erosion & sediment control, and landscaping.
Link to page -
St. Charles Road Bridge Improvement Project
This project consists of repairs to the St. Charles Road bridge in order to maintain its safety.
Link to page -
Second Avenue Combined Sewer Separation Project
This project consists of the separation of the existing combined sewer main on North Second Avenue from Holly Court to Division Street.
Link to page -
Yale Avenue (Plymouth to Ridge)
This project consists of the reconstruction of North Yale Avenue from Plymouth Street to Ridge Road. The project includes replacement of the existing water main. Some selective sanitary sewer system improvements are also included.