Plymouth Street Improvement Project (Ardmore to Villa)
General Information
Project Location(s): | East Plymouth St from Ardmore Ave to Villa Ave |
---|---|
Project Status: | Closeout |
Bid Opening Date: | Tuesday, August 18, 2020, at 11:00 a.m., Via Zoom |
QuestCDN Number: | 7237848 |
Construction Start Date: | Fall 2020 |
Construction Completion Date: | Spring 2021 |
Contractor: | Brothers Asphalt Paving, Inc. |
Construction Engineer: | Civiltech Engineering, Inc. |
Design Engineer: | Civiltech Engineering, Inc. |
Awarded Contract Amount: | $762,561.18 |
Adjusted Final Contract Amount: | TBD |
Funding Source(s): | DCEO Grant |
Objective
To improve the condition of East Plymouth Street through resurfacing of the roadway with hot-mix asphalt (HMA).
Description
This project consists of improving Plymouth Street from Ardmore Avenue to Villa Avenue in the Village of Villa Park which includes hot-mix asphalt (HMA) resurfacing and HMA pavement reconstruction. The total length of improvements is 2,594 feet (0.49 mile). The pavement resurfacing areas will consist of 2” of HMA surface course and ¾” of polymerized leveling binder. These resurfacing areas will also have pavement patching and spot curb and gutter replacement based on field conditions. The pavement reconstruction areas will be composed of 2” HMA surface course, 4” HMA binder course and 6” aggregate base course supported on a geotechnical fabric. In addition, there will be sidewalk replacement at intersections to meet the Public Right-of-Way Accessibility Guidelines (PROWAG), driveway reconstruction, drainage and utility improvements, pavement markings, signing, erosion & sediment control, and landscaping. This project is being funded by a State grant administered by the Department of Commerce and Economic Opportunity (DCEO) which requires participation goals for Minority Business Enterprise (MBE), Women Business Enterprise (WBE), and Veterans Business Enterprise (VBE) as outlined in the Contract Documents.
Justification
The roadway has deteriorated to the point where resurfacing is needed.
BIDDING INFORMATION
The Bidding Documents are on file for inspection at the office of the Village of Villa Park Public Works Department, 11 West Home Avenue, Villa Park, Illinois, 60181. Digital copies of the bid documents are available at www.questcdn.com for a non-refundable fee of $30.00. These documents may be downloaded by entering Quest Project Number 7237848 on www.questcdn.com. No paper bids will be accepted.
The bid proposals will be read aloud through the use of Zoom. The https://zoom.us/j/96627900215?pwd=elRVRC9UVFg0eEg0a2g4QUxFWFIwUT09 link or (312) 626-6799 call-in number with Meeting ID 966 2790 0215 and Password 302589 can be used to access Zoom.
Bidding Documents
Contract Documents
PLANHOLDERS
Organization | Organization Address |
---|---|
See QuestCDN for more information. |
Project Updates
Date | Description |
---|---|
August 6, 2021 | Construction is complete. Staff has submitted a request for reimbursement of grant funding to the Illinois DCEO. |
June 11, 2021 | Staff has submitted a request for reimbursement of grant funding to the Illinois DCEO. |
May 28, 2021 | Staff is in the process of compiling the documentation for a request for reimbursement of grant funding from the DCEO. |
January 1, 2021 | Construction is substantially complete. |
December 11, 2020 | Construction is substantially complete. The contractor is working on punch list items. |
December 4, 2020 | The contractor is working on punch list items. |
November 13, 2020 | Construction is substantially complete and the contractor is working on punch list items. |
October 30, 2020 | Construction is underway. Current operations include surface paving. |
October 9, 2020 | Construction is underway. Current operations include pavement patching and concrete curb and gutter installation. |
October 2, 2020 | Construction is expected to begin the week of October 5, 2020. Preliminary efforts, including utility locating, traffic control, and erosion protection will be completed first, and full construction operations will follow. |
September 23, 2020 | A pre-construction meeting was held with the contractor and engineering consultant. Construction is expected to begin within the next few weeks, with preliminary efforts beginning sooner. |
September 14, 2020 | The contract award recommendation was approved at the September 14, 2020 Village Board meeting. |
September 4, 2020 | A bid opening for this project was held last week. Staff has reviewed the bids and has submitted a contract award recommendation for consideration at the September 14, 2020 Village Board meeting. |
August 28, 2020 | A bid opening for this project was held last week. Staff is in the process of reviewing the bids. Because the project will receive State of Illinois Capital Bill grant funding through the Illinois DCEO, staff must evaluate bidders’ compliance with grant requirements prior to proceeding with a contract award recommendation. |
July 31, 2020 | The project was advertised for bidding. |
Contact Us
-
Michael Guerra, P.E.
Public Works Director
Email the Engineering Division
Online Contact Form
Staff Directory
Office Address
Public Works Department
11 West Home Avenue
Villa Park, Illinois 60181
Mailing Address
Public Works Department
20 South Ardmore Avenue
Villa Park, Illinois 60181
Ph: 630-834-8505
Fx: 630-834-8509
Emergency: 630-834-7447
Hours
Monday through Friday
7:30 a.m. to 4:00 p.m.