South Monterey Stormwater Quality Project

General Information

Project Location(s):South Monterey Avenue between
Washington Boulevard and Madison Street.
Project Status:Pre-Construction
Bid Opening Date:Tuesday, September 11, 2018, at 10:00 A.M.
Start Date:Monday, October 8, 2018 (Tentative)
Completion Date:Thursday, November 15, 2018.
Contractor:McGinty Bros. Inc.
Construction Engineer:In-House
Design Engineer:In-House
Awarded Contract Amount:$70,914.50
Adjusted Final Contract Amount:TBD
Funding Sources:Stormwater Fund

Objective

To help drainage conditions on Monterey Avenue between Madison Street and Washington Boulevard, and to help stormwater quality by treating runoff from 5.5 acres of suburban single-family home area directly tributary to Sugar Creek.

Description

This project consists of the installation of 12 bio-retention systems, each approximately 37 feet long by 6 feet wide, within the existing drainage ditch area on South Monterey Avenue between Washington Boulevard and Madison Street in the Village of Villa Park.

Justification

Monterey Avenue between Madison Street and Washington Boulevard has ditch drainage. The ditch is directly tributary to Sugar Creek. The Village of Villa Park obtained grant funding from IEPA through Illinois Green Infrastructure Grant (IGIG) to construct a series of bio-retentions in the drianage ditch to improve the quality of stormwater runoff. Some ditch modifications will be made to improve stormwater conveyance to help with drainage issues as well.

Bidding Documents

Contract Documents

  • None at this time

Project Documents

Planholders

OrganizationOrganization Address 
McGinty Bros. Inc.
3744 Cuba Rd
Long Grove, IL 60047
Native Landscape Contractors, LLC10729 Pine Rd
Leland, IL 60531
Copenhaver Construction, Inc.75 Koppie Dr
Gilberts, IL 60136
K Five Construction Co.999 Oakmont Plaza Dr, Suite 200
Westmont, IL 60559 
A Lamp Concrete Contractors, Inc.1900 Wright Blvd
Schaumburg, IL 60193
Fox Excavating, Inc.1305 South River St
Batavia, IL 60510

Project Updates

Posted DateDescription 
October 11, 2018The start of construction was delayed. Construction is expected to begin next week.
October 3, 2018A letter was delivered to residents notifying them of the expected construction start date and related project information.
September 27, 2018A pre-construction meeting was held on Thursday, September 27, 2018. Construction is expected to begin in October.
September 11, 2018A bid opening was held on Tuesday, September 11, 2018 at 10:00 A.M. The apparent low bidder was McGinty Bros. Inc. Staff will submit a contract award recommendation at an upcoming board meeting.
August 24, 2018The Project was advertised on August 24, 2018. The bid deadline is Tuesday, September 11, 2018, at 10:00 A.M.