Completed Projects 2016

  1. 2016 Asphalt Rejuvenation

    In an effort to slow down the deterioration of its new asphalt pavements, the Village instituted the Asphalt Rejuvenation Program in 1986. Rejuvenating agents known as “CRF” and “Reclamite” are applied to the surface of previously resurfaced or reconstructed asphalt pavements. These rejuvenating agents help seal the small cracks in the pavement. They also help revitalize the asphalt by replacing some of the liquid ingredients that have evaporated

    Link to page
  2. 2016 Crack Seal Program

    In an effort to slow down the deterioration of its asphalt pavements, the Village instituted the Crack Sealing Program.

    Link to page
  3. Ardmore Avenue Streetscape Project

    To enhance the walkability, driveability, and aesthetic quality of the North Ardmore Avenue corridor.

    Link to page
  4. South Monterey Culvert Replacement Project

    This project consists of ditch re-grading, culvert pipe and approach removal and replacement in public right-of-way on South Monterey Avenue between Washington Boulevard and Madison Street.

    Link to page
  5. East Park Boulevard Improvement Project

    This project consists of the complete reconstruction of East Park Boulevard from Villa Avenue to the east dead end.

    Link to page
  6. Pavement Patching 2016

    This project consists of patching various streets throughout the Village.

    Link to page