Construction Projects

  1. Completed Projects

    Completed projects from 2014 to present.

  2. Contracts

    A list of contracts for projects.

  3. 2016 Street Improvement Project

    This project consists of the rehabilitation of various streets by means of various pavement rehabilitation methods.

  4. 2017 Street Improvement Project

    This project consists of the rehabilitation of various streets by means of various pavement rehabilitation methods.

  5. Astor & Myrtle Improvement Project

    This project consists of the reconstruction of Astor Court from Summit Avenue to Myrtle Avenue and Myrtle Avenue from Park to Highland, and includes storm sewer construction. Some selective water system and sanitary sewer system improvements are also included.

  6. Biermann Avenue Sewer Separation Project

    This project consists of the rehabilitation of North Biermann Avenue from North Avenue to Sunset Drive by means of selected pavement rehabilitation methods. The project also includes replacement of the existing 6" water main. Some selective sanitary sewer systems improvements are also included.

  7. Central Boulevard Improvement Project

    This project consists of the rehabilitation of East Central Boulevard from Cornell Avenue to Villa Avenue and South Myrtle Avenue from Kenilworth Street to Central Boulevard, and Cortesi Avenue from Kenilworth Street to Central Boulevard. The project includes combined sewer separation. Some selective water system and sanitary sewer system improvements are also included.

  8. College Streets Water Main Improvement Project

    This project consists of the replacement of existing 4" and 6" water mains on North Iowa Avenue from Stone to Vermont, on North Michigan Avenue from Stone to Vermont, and on West Vermont Street from Wisconsin to Harvard. The project will also include pavement improvements on Iowa and on a portion of Michigan Avenue.

  9. Combined Sewer Separation / Washington Corridor

  10. Flood Control Study

    The Village hired three engineering consultant companies to study the whole of Villa Park in an effort to create a plan to reduce the amount of flooding for residents.

  11. Floodplain Mapping

    FEMA Floodplain Mapping.

  12. High Ridge Road Resurfacing Project

    This project consists of the resurfacing of High Ridge Road from Ardmore Avenue to the west Village limits.

  13. Long Term Control Plan (LTCP) and (CMOM)

    To enhance the walkability, driveability, and aesthetic quality of the North Ardmore Avenue corridor.

  14. South Michigan Avenue (Park to Madison)

    This project consists of the reconstruction of Michigan Avenue from Park Boulevard to Madison Street and the installation of storm sewers. Selective replacement of water mains and sanitary sewer mains is included.

  15. South Michigan Avenue and Jackson Pond Improvement

    This project consists of pavement improvements on South Michigan Avenue from Jackson Street to Madison Street and the installation of storm sewers. Some selective water and sanitary system improvements are included. The project includes the expansion of the Jackson Pond detention basin.

  16. North Side Sidewalk Project

    To increase pedestrian safety and provide better access to residences and businesses on the north side of the Village.

  17. North Princeton Water Main Improvement Project

    This project consists of the replacement of the existing water main on North Princeton Avenue from Terrace Street to Ridge Road in the Village of Villa Park with approximately 1,200 lineal feet of new eight inch (8)” ductile iron water main. The project also includes the installation of new valves and valve vaults, fire hydrant assemblies, water services, and all necessary restoration and related work.

  18. Ridge Road Water Main Improvement Project

    This project consists of the rehabilitation of Ridge Road from Yale to Ardmore. The project also includes replacement of the existing water main. The water main improvements are budgeted as part of IEPA Water Loan Group #3. Some selective sanitary sewer system improvements are included.

  19. Second Avenue Combined Sewer Separation Project

    This project consists of the separation of the existing combined sewer main on North Second Avenue from Holly Court to Division Street. A grant application is expected to be submitted for Community Development Block Grant Disaster Recovery (CDBG-DR) funding for construction.

  20. St. Charles Road Bridge Improvement Project

    This project consists of repairs to the St. Charles Road bridge in order to maintain its safety.

  21. Stormwater Management Program

    Stormwater Management Program

  22. Sugar Creek Watershed Plan

  23. South Summit Avenue Resurfacing Project

    This project consists of the resurfacing of the portions of South Summit Avenue from Madison to Roosevelt located in the Village of Villa Park.

  24. Washington Street Green Infrastructure Improvement

    Washington corridor green infrastructure project ($1 million funding) and Sugar Creek storm water improvements ($550,000).