Construction Projects

  1. Completed Projects

    Completed projects from 2014 to present.

  2. Contracts

    A list of contracts for projects.

  3. 2016 Asphalt Rejuvenation

    In an effort to slow down the deterioration of its new asphalt pavements, the Village instituted the Asphalt Rejuvenation Program in 1986. Rejuvenating agents known as “CRF” and “Reclamite” are applied to the surface of previously resurfaced or reconstructed asphalt pavements. These rejuvenating agents help seal the small cracks in the pavement. They also help revitalize the asphalt by replacing some of the liquid ingredients that have evaporated

  4. 2016 Crack Seal Program

    In an effort to slow down the deterioration of its asphalt pavements, the Village instituted the Crack Sealing Program.

  5. 2016 Home Avenue Water Tower Grounding Project

    This project consists of the installation of electrical grounding equipment on and adjacent to the water tower located at 11 West Home Avenue. The project also includes other related work, including earthwork and grading, removal and replacement of chain line fence, installation of a concrete spill pad, and placement of topsoil and sod.

  6. 2016 Street Improvement Project

    This project consists of the rehabilitation of various streets by means of various pavement rehabilitation methods.

  7. Astor & Myrtle Improvement Project

    This project consists of the reconstruction of Astor Court from Summit Avenue to Myrtle Avenue and Myrtle Avenue from Park to Highland, and includes storm sewer construction. Some selective water system and sanitary sewer system improvements are also included.

  8. College Streets Water Main Improvement Project

    This project consists of the replacement of existing 4" and 6" water mains on North Iowa Avenue from Stone to Vermont, on North Michigan Avenue from Stone to Vermont, and on West Vermont Street from Wisconsin to Harvard. The project will also include pavement improvements on Iowa and on a portion of Michigan Avenue.

  9. Combined Sewer Separation

  10. Flood Control Study

    The Village hired three engineering consultant companies to study the whole of Villa Park in an effort to create a plan to reduce the amount of flooding for residents.

  11. Floodplain Mapping

    FEMA Floodplain Mapping.

  12. Green Storm Water Infrastructure

    Washington corridor green infrastructure project ($1 million funding) and Sugar Creek storm water improvements ($550,000).

  13. High Ridge Road Resurfacing Project

    This project consists of the resurfacing of High Ridge Road from Ardmore Avenue to the west Village limits.

  14. Long Term Control Plan (LTCP) and (CMOM)

    To enhance the walkability, driveability, and aesthetic quality of the North Ardmore Avenue corridor.

  15. South Michigan Avenue Improvement Project

    This project consists of the reconstruction of Michigan Avenue from Jackson Street to Madison Street and the installation of storm sewers. Selective replacement of water mains and sanitary sewer mains is included.

  16. North Side Sidewalk Project

    To increase pedestrian safety and provide better access to residences and businesses on the north side of the Village.

  17. North Princeton Water Main Improvement Project

    This project consists of the replacement of the existing water main on North Princeton Avenue from Terrace Street to Ridge Road in the Village of Villa Park with approximately 1,200 lineal feet of new eight inch (8)” ductile iron water main. The project also includes the installation of new valves and valve vaults, fire hydrant assemblies, water services, and all necessary restoration and related work.

  18. St. Charles Road Bridge Improvement Project

    This project consists of repairs to the St. Charles Road bridge in order to maintain its safety.

  19. Storm Water Management Program

    Storm Water Management Program

  20. Sugar Creek Watershed Plan

  21. South Summit Avenue Resurfacing Project

    This project consists of the resurfacing of the portions of South Summit Avenue from Madison to Roosevelt located in the Village of Villa Park.